What Is Our Standard Installation?
- The fitting of the EV charger to a brick/rendered wall.
- Up to 10 metres of 6mm power cable. This will be neatly clipped to the wall between the distribution board/electricity supply metre.
and the charger. - Routeing the cable through a drilled hole in a wall up to 500 mm thick (if needed).
- The fitting and testing of electrical connections and protections needed for the EV charger.
- Up to 5 metres of white plastic covering for the interior wiring.
Installation by one of our expert engineers. - Installation compliance with the current British Standard Wiring Regulations (BS7671) and any associated documents/codes of
practice, as well as the charger manufacturers’ instructions. - Commissioning and pairing with your smartphone—with full support from our engineer. You must be present with your smartphone
at the time of commissioning.
A full demonstration of how your new charger works. Our engineer will be happy to answer any questions you have.



Reviews
There are no reviews yet.